Client/Customer Vietnam Oil and Gas Group
Plant/Location Thai Binh 2 Thermal Power Plant
Duration Apr.2024
Scope of Work

- Processing, installing, pumping glue to treat drain leaks.

- Pipe pressure: 4MPa, temperature: 450 degrees Celsius.

Drain Hot-reaheat online leak sealing

Drain Hot-reaheat online leak sealing - Thai Binh 2 Thermal Power Plant

Drain Hot-reaheat online leak sealing

Drain Hot-reaheat online leak sealing - Thai Binh 2 Thermal Power Plant

Drain Hot-reaheat online leak sealing

Drain Hot-reaheat online leak sealing - Thai Binh 2 Thermal Power Plant

Other Projects

Providing Area 2 hydraulic bolt tightening service - TA 2023

Providing Area 2 hydraulic bolt tightening service - TA 2023

  • Oct
  • 2023
View more
Online leak repair for of reduce temperature line Furnace 1

Online leak repair for of reduce temperature line Furnace 1

  • Dec
  • 2023
View more
Dynamic balancing for pump impeller 045-P-101A/B/C/D

Dynamic balancing for pump impeller 045-P-101A/B/C/D

  • Sep
  • 2021
View more
WHR Turbine  -  Generator Overhaul

WHR Turbine - Generator Overhaul

  • Feb
  • 2024
View more
Overhaul of Residual Heat Boiler No. 1

Overhaul of Residual Heat Boiler No. 1

  • Aug
  • 2024
View more
Cleaning steam turbine heat exchanger

Cleaning steam turbine heat exchanger

  • Oct
  • 2020
View more