Client/Customer
AES Mong Duong Power Company Limited
Plant/Location
AES Mong Duong 2 Thermal Power Plant
Duration
Sep.2023 - Dec.2023
Categories
Online leaks sealing - hot taping
Scope of Work
- Calculate data, design, process and manufacture Clamp.
- Install clamp, glue injection for online leak sealing of elbow 2" pipe line.
Pipeline information:
- Pressure: 18.5 Mpa.
- Temperature: 500 degrees Celsius.
- Medium: Steam.
