Manufacturing, installing D600 steel pipes
Fabrication and installation of D600 steel pipe line.
- Processing and manufacturing D600 pipe sections at the workshop.
- Installing and dismantling scaffolding.
- Excavation of soil, pouring concrete of anchor and pipe support abutments.
- Transport, install, weld, paint the pipeline.
- Construction of water intake zones.
Other Projects
Online Leak sealing for CO Coal Gas Pipeline
On-line leak sealing for 110-PV-0034 valve
Repair and maintenance for Turbine Unit 2
Overhaul for Fuel Supply Pump System Flowserve PU201-203
General Maintenance (DCSM)