Online leak sealing of water supply line to boiler A
Survey, calculate data, design, manufacture Clamp.
Install clamp, pump glue to seal online the leak.
Pipeline information:
- Pressure: 4.88 MPa.
- Temperature: 250 degrees C.
- Medium: Water.
Online leak sealing of water supply line to boiler A - Ha Bac Fertilizer and Chemical Factory
Other Projects
Overhaul for Fuel Supply Pump System Flowserve PU201-203
Scaffolding rental for shutdown period 2021
Installing bucket elevator, fans - Line 3
Boiler repairing
Repair and install mechanical workshop