Overhaul turbine, generator and auxiliary equipment Unit 2
Repair, maintenance, overhaul of turbine, generator and furnace auxiliary equipment No. 2:
- Turbine repair and maintenance: Disassemble, repair, maintain, alignment, reinstall.
- Blasting by aluminum powder to clean turbine rotors and diaphragms.
- Repair and maintenance of 60MW generator.
- Repair and maintenance of Stop valve, Steam Turbine Regulating Valve system.
- Repair and maintenance of oil pumps, oil coolers, etc.
Other Projects
Manufacturing, installing D600 steel pipes
Repair, maintenance, dynamic balancing of pump impellers
Supplying flange facing, manpower supply service
Repair, maintenance, replacement of fan bearings
Repair and maintenance of blower turbines