Repairing, maintaining 41MW Steam turbine
Repair - Maintenance and alignment of 41MW Steam Turbine:
- Disassemble, clean, repair and maintain Turbine parts.
- Replace parts: bearing bearings, seals...
- Align and reinstall parts.
Other Projects
Equipment, structure erection of Circulating Fluidized Bed Boiler 2x35T/H
Scaffolding rental for Shutdown period 2022
Dynamic balancing for pump impeller 045-P-101A/B/C/D
Overhaul and maintenance of 12U100 technology air compressor system
Providing services for loosen and tightening hydraulic bolts in Boiler - TA 2023