Equipment, structure erection of Circulating Fluidized Bed Boiler 2x35T/H
- Erecting and dismantling scaffolding.
- Erection of steel structure.
- Install electrostatic precipitator.
- Install and align the fan.
- Install and align the pump, etc
Other Projects
Dynamic balancing for pump impeller 022-P-216A
Repair and replace the roller bearings supporting the drying drum
Manpower, equipment supplying to perform painting and sandblasting services
Online leaking sealing for valve body 3" class #2500
Overhauling turbines and generators