Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Fabrication, installing water supply pipes across Vam Co Dong river
On-line leak sealing for 110-PV-0034 valve
Overhaul and maintenance of 12U100 technology air compressor system
On-line leak sealing for the water supply pipe for the absorber
Scaffolding rental for shutdown period 2021