Repair/Overcome the vibration of Turbine Unit 1

Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.

  • Adjust parameters of journal bearing 3,4.
  • Repairing pillow pedestals number 3, 4.
Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine turning-device - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Other Projects

Repairing Boiler and auxiliary equipment

Repairing Boiler and auxiliary equipment

View more
Supply of equipment, piping flange re-surfacing services

Supply of equipment, piping flange re-surfacing services

View more
Installing pipes, equipment to convert raw CO2 lines

Installing pipes, equipment to convert raw CO2 lines

View more
4th General Maintenance (DCSM)

4th General Maintenance (DCSM)

View more
Overhaul for Fuel Supply Pump System Flowserve PU201-203

Overhaul for Fuel Supply Pump System Flowserve PU201-203

View more
Repair and replace GRP pipe systems

Repair and replace GRP pipe systems