Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Manufacturing, installing D600 steel pipes
Cleaning heat exchangers
Supply of equipment, piping flange re-surfacing services
Cleaning, welding for leak sealing of equipment E04504
Equipment, structure erection of Circulating Fluidized Bed Boiler 2x35T/H