Installing pipes, equipment to convert raw CO2 lines
Construction and installation of pipelines, installation of equipment to convert raw CO2 supply lines.
Pre-commissionging and commissiong the system.
Other Projects
Cleaning, welding for leak sealing of equipment E04504
Repair, maintenance, dynamic balancing of pump impellers
Design, processing, manufacturing, and installation of rotary kiln body
Online leak sealing at flange of safety valve 30-PSV-1013
Cleaning the outlet pipes of pump 14P203-2024