Removal, sanitary cleaning, island working surface the Element Baskets air dryer GAH furnace 1
- Remove and re-install the Element baskets.
- Clean element baskets with high pressure water.
- Flip the working surface of the Elements Baskets.
Other Projects
Design, manufacture and installation of LNG regasification system
Supply of equipment, piping flange re-surfacing services
Installing pipes, equipment to convert raw CO2 lines
Online leaking sealing for valve body 3" class #2500
Online leak sealing at 0.75-inch water stagnant discharge line